Hey all, I got a quote from a contractor to install a new HVAC system. Their original proposal was for single-stage equipment and I asked for two-stage equipment and a 3-ton condenser as an optional add-on. They came up with this:
Furnace: 926TA42060V17 (Bryant) Coil: C48H175P156 (ADP) Condenser: 127ANA048000 (Bryant)
Looking this up on ahridirectory.org yields nothing. They're arguing that the blower speed on the furnace would have to be slowed down to work with a 3-ton unit. Is this horse shit? I get that the price difference between the 3-ton and 4-ton units is probably negligible but I don't want to pay for it if I don't need it.
[link] [comments]
No comments:
Post a Comment